|
Technical
Optical system GOTO : Orpheus Digital system Evans_and_Sutherland : Digistar 7 Software: Digistar 7 Video system 2 vp : center Meridian resolution 4.0 K
Facilities
Operation
History
- 1978: 16m/170s/Viewlex IV
- MAPS 2009 (close to Goddard Space Flight Center)
- 2020: closed (Covid) then total renovation (floor, dome, seats, walls, etc.)
- September 2024: reopening, GOTO Hybrid
Last major evolution: 2024: Hybrid system
Comments
|
Latitude: 38°59'24" N -
Longitude: 76°50'22" W -
Altitude: 57m
|